Got shanghaied by the wife and pressed into service planting shrubs and flowers so the wagon took a backseat for a couple of days. I didn't actually work that long on the gardening, but I was too worn out to do anything much else for a few days. I have managed to get the fuel and brake lines formed and fastened to the frame. Didn't like the look of the inverted flare unions I'd planned to connect the 6' stainless fuel lines. So I machined a couple of sleeves and then soldered them together instead. I was a bit careless on my first try and didn't clean the parts well enough and had a leak under pressure. Second time around was much better. Left 120psi on them for a half hour with no leaks. Sooner or later I reckon I need to drop the body down on the frame.