View Single Post
Old 01-18-2020, 07:27 PM   #67
70-Chevy
-Chris
 
70-Chevy's Avatar
 
Join Date: Sep 2002
Location: Moyock, NC
Posts: 622
Re: Project: "No Name"

Well, been awhile since I've done an update, so here we go with progress.....

1. Completed fuel system with new fuel pump, filter, SS braided hose and -8AN fittings.
2. Completed power steering system with new reservoir and all new SS braided hoses and fittings.
3. Completed transmission braided hoses and fittings.
4. Completed Wilwood brake system, new brake lines, master cylinder, etc.
5. Completed painless wiring harness install throughout the truck with all new LED lighting, Halo LED headlights, dual electric fans, fuel pump, interior, etc.
6. Completed Dakota Digital gauges and connections throughout the truck.
7. Installed firewall padding and carpet.
8. Completed MSD wiring.

Tomorrow, going to fire it up for the first in the truck. Seats and door panels are ordered and on the way.

Last thing to order are the wheels and tires!
__________________
1970 Chevy C-10 P/U, Shortbed, Fleetside - 5/7 drop, 496, TH400, 12 bolt.

BUILD THREAD - http://67-72chevytrucks.com/vboard/s...d.php?t=404481

2012 F250 Super Duty P/U - intake, exhaust, tuner, 4" lift with 35's

2017 Chevy Suburban (Wifes Car)
- Fully Loaded & Stock

"Some people spend an entire lifetime wondering if they made a difference in the world. But, the Marines don't have that problem."
Ronald Reagan, President of the United States; 1985
70-Chevy is offline   Reply With Quote