Re: '47 Loadmaster COE (rebuild pictures)
5-6-2014
OK, so with the bed off it was time to address the cab, after doing some measuring it looked like with the radiator support out of the way the cab could be lifted and the chassis rolled away. The cab removal and stripping the wiring harness from the engine/trans took 2 days.
|