If your codes are like ours here, then you will need a row of 2 X 6 blocks on center up 8 feet from the bottom plate in the wall. Snap a line at 8' up from the bottom plate so the line will center the blocks for nailing for a sheet above and a sheet below. That if it's going to be inspected. If not...... I recommend it be done to strengthen the wall, You might want to check the nailing pattern that the inspectors want on the perimeter and in the field as well. Better to check now and save doing things over and after the sheeting is on.