Re: Bagged 66 swb stepside project: Major Chip Hazard
Started welding it all up in the back. Got the firewall cut up so the clutch fork can actually work and cab sitting correctly. Glam shot.
Going to be slow rolling for awhile waiting on parts after i get the back half all welded up. Going to be a lot of sheet metal work to get the drive shaft tunnel finished and the floor pans done.
|