$.
That was actually my original plan.
This was a lot more cost effective. Anything 4' and over needs to be designed by a wall engineer and approved by the county.
After the tree removal, power relocation, grading, and floor/foundation, and driveway I'll be 19K into this before a wall even goes up.
Quote:
Originally Posted by Ol Blue K20
Awesome! I hope everything comes together smoothly.
|
Already problems...
The damn phone company ran mine and my neighbors phone lines on my property, so I have to let him know he may be without a phone for a little while. I can't have them come in to fix it until all the grading is done.