I got a lot of work done on the Burb yesterday.Everything on the undersid is done including relocating the trans cross member for the 4L80E and drilling a new hole for the trans mount.The newly cut down and balanced aluminum drive shaft installed,exhaust hooked up,trans fill tube for truck(instead of long ass van tube) located/bought and installed.I also switched over some sensors and hooked up the wiring harness nice and neat.It has been raining all morning so me and the boy have been playing together looking outside at the burb waitng for a break in the weather.I dont have much left to do now.I need to run the plug wires.hook up the alt. ,power steering and install the front clip.Then hook up the wire for the lock-up converter to my brake light switch.I WILL BE DRIVING THE BURB THIS WEEK AND NOTHING WILL STOP ME!!!I'll keep yall posted.wish me luck