View Single Post
Old 08-17-2013, 09:26 PM   #104
Johnnyfever
Registered User
 
Join Date: Oct 2011
Location: Belton, SC & Atlanta, GA
Posts: 181
Re: 1970 Project Build

And on to the process of shaving the key hole. First I removed the key hole lip with a hack saw. Then sanded it down smooth, filled it with a scrap piece of sheet metal steel cut to fit, and then the JB Weld. The next step was Rage Gold. This project might be a little strange, but I wanted to give it a try.
Attached Images
     
__________________
Yes, it's a Short Wheel Base, not a Short Wide Bed.
Johnnyfever is offline   Reply With Quote