Re: 72 Swb starting from the bottom
I guess I did get more done than I thought. I got the hoop almost completely welded in. The exhaust rings are welded in. Rear exhaust hangers are welded in. Made some brackets to hold bump stops so the axle isn’t resting against the frame when aired out. Made some progress on the exhaust crossover to go under the driveshaft. Had to rig up some pipe to allow me to make the tubing into an oval. Also decided to make the gas tank flush with the top of the frame after putting the rear bumper on it won’t be hanging down below it.
|