View Single Post
Old 01-31-2018, 12:04 PM   #5
cebra
Registered User
 
Join Date: Jan 2018
Location: Durham, North Carolina
Posts: 782
Re: 71 Cheyenne Rooftop Build

I have the heater boxes nearing completion. I replaced all the hardware, gaskets, cables, blower motor, heater core, and heater hoses. I need to paint the fire wall on both side and then I will reinstall. Removing the heater boxes wasn't as bad as I had thought it may be. Thus far, replacing the side windows and regulators has been the biggest pain.
Attached Images
   
cebra is offline   Reply With Quote