View Single Post
Old 01-12-2021, 05:29 AM   #337
The Rocknrod
Moderator

 
The Rocknrod's Avatar
 
Join Date: Aug 2011
Location: China Spring, TX
Posts: 7,280
Re: New 64 Stepper Project

So Summit finally got back to me about their vendor sending me too much sound deadner/heat shield. Seems they (the vendor) will be sending me the correct stuff and a UPS will call to send out the boxes of incorrectly sent items.
Slows my whole door process down quite a bit. Once the glass goes in can't get in the sound deadner.
And my door mirror, the three fastener holes are 5/6"-18 not 1/4"-20 that was sent with the mirror, another slow down. I ordered three stainless ones from the bolt depot, so I'll be polishing those when they get in.
Guess it's time to call Extreme Automatics for my transmission and Blueprint Engines for the engine.

Last edited by The Rocknrod; 01-12-2021 at 05:36 AM.
The Rocknrod is offline   Reply With Quote