View Single Post
Old 12-29-2017, 10:42 AM   #14
CSHADES
Registered User
 
CSHADES's Avatar
 
Join Date: Nov 2015
Location: portage wi
Posts: 503
Re: Special 1946 project

Not only did I drill the 680 holes in the board I had to go back over every one of them and deburr each hole on both sides. So basically I drilled the holes three times plus the outside mounting holes. So after days of sanding I was finally ready to lay down some paint. At this point the deadline of Christmas was getting close so I started taking off early from work, I was leaving work between 2-3 pm and working until 9 pm every night and 8am-8pm on the weekends to get this thing done. So when I painted these parts I started laying the white on about half way through I figured out that I was going to be short on white and it was Saturday night. Luckily the parts store that mixes paint was open on sunday and they mixed me some more so I did get it done on Sunday. but it messed up my schedule for finishing this.
Attached Images
    
CSHADES is offline   Reply With Quote