View Single Post
Old 06-11-2009, 02:34 PM   #39
sgaylord
Project collector
 
sgaylord's Avatar
 
Join Date: Mar 2006
Location: Sanderson, Fl
Posts: 700
Smile Re: Project "Jezabel"

Update:

My plan is to remove the spot welds from the donor section and separate it into 3 pieces. Firewall, upper cowl, and lower cowl & kick panels. I will then repair any minor parts that need attention and spot weld them into Jezebel following the same procedure GM used in the day. There probably was a better way of doing this by leaving it all together and installing it in one chunk. I was just worried with door alignment as well as I did not know what shape the "A" pillars were in. This way I can apply attention to any area that needs it, it's just going to take a little more work to get there. In the end I will know what I have, unlike before.

Here are some pics peeling the onion so to speak.
Name:  DSCN1657.jpg
Views: 2123
Size:  36.5 KB
Name:  DSCN1664.jpg
Views: 2124
Size:  99.0 KB


This is the section that was totally rusted in Jezebel. This section will make her water tight again.. :-)
Name:  DSCN1675.jpg
Views: 2124
Size:  99.7 KB
Name:  DSCN1674.jpg
Views: 2132
Size:  99.8 KB
__________________
69 CST-10 SWB (disguised as a 67) 383/700r4 Jezebel
Jezebel 3.0 NEW!!!

2020 GMC 3500 Denali Duramax
2016 Harley Street Glide CVO

Roll Tide!

Last edited by sgaylord; 12-21-2009 at 11:03 AM.
sgaylord is offline   Reply With Quote