Thread: Project 67
View Single Post
Old 08-26-2013, 10:42 AM   #183
Sammy
Registered User
 
Join Date: Apr 2000
Location: Bonne Terre, Mo
Posts: 3,005
Re: Project 67

The replacement driver's side bed is in 2K along with the cab cowl ready for final paint. The two front fenders are close to ready for primer also. Surprisingly, wasn't as bad as I remembered. Close to working on the bed soon. Possible to have the major paint finished except for touch up before the first freeze. Currently the humidty is above 50% staying around 56% much too high for getting good results. And painting late at night isn't worth the effort in my redneck operations.
__________________
'69 Chevy Long Fleet & '71 GMC Short Step & Project "ODD BALL"


"You can wash a pig, soak it in most expensive perfume. In the end it is still just a pig."

ODD BALL build thread http://67-72chevytrucks.com/vboard/s...d.php?t=478629"
Sammy is offline   Reply With Quote