Here is the end result: A semi-stock looking cover for your gas-hole (har har).
It doesn't look that bad up close or at a distance. It's a cheap solution for me to get by until I can weld everything up properly.
Total project time was 1.5 hours, with beer, and I made everything up as I went. Without beer, after reading this tutorial, you could probably finish the job in less than 45 minutes. I personally prefer using the beer method if you are of age, but remember - all things in moderation!!
Enjoy
__________________
If I've got anything up for grabs, it'll be here: 7-hole gauge cluster for a 67-72 p/u FREE (
link)
I can't check the forum daily. If I don't reply to you within 24 hours,
drop me a PM! I'm (hopefully) still alive and will reply faster to a PM.