So here is our LS Swap - Progress Report Card - LSS-PRC
1. Mount the engine - Done!
2. Mount the transmission - Done!
3. Install heater core bypass - Done!
4. Plumb the power steering lines- Done!
5. Plumb the transmission fluid lines - Done!
6. Install the B&M shifter cable - Done!
7. Plumb the water pump - Done!
8. Install the shortened drive shaft - Done!
9. Install the exhaust manifolds and down pipes - Done!
10. Install the fuel pump and plumb the fuel system
11. Install the drive by wire throttle pedal
12. Install the engine wiring harness
13. Install the cold air intake