I'm getting really close to firing this thing up. The electrical system is 99% done. A few ground wires to finish off and then testing. After testing, finish up the wire braid and get everything mounted with cushion clamps.
Over the last few days I completed the PDM.
Here it is painted up. I also added a mounting hole for my coolant recovery tank.
The back side.
Start of wiring. All metri-Pack 280 terminals so easy to assemble. Just takes time.
All wired up.
All the fuses, relays and circuit breakers installed. All in all this set of boxes houses 12 additional circuits and 6 relays, as planned. Here you can really see the amount of expansion room I've got. I could have crammed it all in one box, but I figured I'd have some expansion room. Notice I also had to go from one hole to 2 holes. Lots of big wires in the bottom hole, like several 10 ga and one 8 ga. So if I need to expand, probably wind up with a 3rd hole or make the top one a little bigger.