Finally after having this build on hold for other projects I am back at it. I have a check list of things to wrap up before I drive the truck. Most of them are assembly items going forward. My goal is to have it going down the road by May 2018.
Over the weekend I was working on getting the major dings out of the bed (see pictures). While filler was drying I worked on a few interior items like finishing the foil backed insulation for under the carpet, got carpet installed and started doing hook ups for the heater duct work.
Going forward I will remove items from the list as they are done.
Here is a list of items left to do:
Interior install items- heater box and new duct hose
- heater controls
- radio
- ash tray
- glove box door and liner
- finish assembly of tilt column
- new steering wheel
- door panels
- 3-point seat belts
- buddy bucket seats
- gauge cluster
Exterior install items- headlights
- grill hoops
- side marker lights
- rear lights and backups
- get new tires for new Summit Legend rims
Things to do after its on the road- ECE 4/6 drop
- paint tailgate and cowl
- repair 2 scratches in new paint ( probably have to repaint items )
- add silver pinstripe
- color sand and polish paint