Tonight was dedicated to the progressing on the 4-Link and various little ankle biters.
Pictures:
1. Got the links painted and set at 21.25 (initial setting for 0 pinion, will play with it later)
2. At aired-out height
3. Up close shot of front hanger and forward link assembly (Malko Fab Co.)
4. Ridetech lower shockwave bracket.
5. I took one of the shock brackets that was removed from the axle housing and taped it to the top of the c-notch bracket, just playing around to get an idea of what Shockwave I may order. I did order and upper Shockwave bracket that will be welded in that location.
I have the panhard bar already figured out; it'll go behind the pumpkin. More on that later.
Mike