The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > 47 - Current classic GM Trucks > The 1960 - 1966 Chevrolet & GMC Pickups Message Board > projects and builds

Web 67-72chevytrucks.com


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 09-10-2011, 06:42 PM   #21
64c20crewcab
Registered User
 
64c20crewcab's Avatar
 
Join Date: Jun 2008
Location: North SD County
Posts: 631
Re: My Build - FINALLY...

We finished baggin the rear of my rig in early July but had to take on other projects before I attack the front end. It don't lay frame but will be a lot lower when I change out the tires.

As some of ya know I had a motor built by a local shop and have had nothing but problems - studs pulling, springs breaking... this just sucked!!!

This being my only ride aside from my bike I need to keep it running. I replaced the studs with screw in and new set of Edelbrock springs.

Well well last week I pulled the motor (white smoke at start up) n trans (leaking). Went to replace valve guide seals and found that the boss around #5 exhaust valve was damaged. I yanked the 76cc chambered heads with 1.94 /1.5 valves. Swappin in a fresh set of 70cc heads with 2.02/1.6 stainless valves. These were to go into a stock car. I will get a bit of a compression bump with these for sure.

Question for any of you that can assist, what head gasket should I use? How thick or thin? Does is really matter? This is my first go around doing some of this. Seem each time I pay somebody to do work - it sucks!

Here is the motor info:
SB350 bored .040 over = 350
Heads: 2.02/1.6 70cc chambers
Cam: Edelbrock 2102 - .442 lift - mild but lookin for a .465 lift cam now

Thanks!
Attached Images
 
__________________
..............................._________
......___________//___[[___{\ _____
...../__(_(O)_)___/____/____/_(O)_/

1964 C20 Long Stepside 3 Door Crew Cab
- Armbruster-Stageway Conversion

Y2K INDN Chief

"ONE OF A KIND, NOT ONE OF THE CROWD"
Aug 2010 - Front end frame cleanup & engine swap done!!!
June 2011 - Rear end bagged
Sept 2011 - Rebuild motor top end
Sept 2012 - Parked and slowly working on it.
Aug 2013 - Front end bagged - finally!
Aug 2014 - Stepside swap conversion done. Finally ready to start bodywork! Have a few KEWL ideas...
Here is my build thread:
http://www.67-72chevytrucks.com/vboa...d.php?t=335427
64c20crewcab is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 03:57 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com