Quote:
Originally Posted by oldiron
Only on suggestion. Put down a vapor barrier down before pouring your concrete. My contractor pulled mine up and now I pump out 8 gallons a day with a dehumifier. The cement guys will say that the concrete will not cure fast enough but the floor will sweat forever.
|
I asked them about that , which WILL come up again . The salesman said no because something about the reinforced fiber ? bla ba bla
Did you add gravel over your site before the pour ? My fill was river run I think they called it than we added a couple inches of 5/8 crushed rock in hopes that what moisture does come up wont wick thru like it would with a dirt base.