Quote:
Originally Posted by jaros44sr
Looks like all the hard work is done, S/B able to hang the panels now with all the pcs. ya have at your shop
|
Actually the hard work hasn't even started yet. EFI programming, turbo, exhaust, NorthWest Fab Black Box. Rebuild a 205 with 32 sppline everything, cable shifters, 2 piece front drive shaft. Build a roll cage around the rocker boxes that tie into the frame, with seat mounts.