Quote:
Originally Posted by Chevyman63
AWESOME dude!!
Are they forming the walls tomorrow?
|
Thursday.
The guy told me the frost wall (short one) will only take about 1/2 an hour but the retaining wall (rebar pic) will be most of the day.
It's an 8ft wall with a small return into the house foundation, then at the driveway end it has a 45 degree turn that will taper down to 6ft.
It's going to allow me to level out the upper yard a lot.