Should I keep this on this thread? Or should I start a new one somewhere?
I quit early today because I'm not feeling that well, so I didn't get much done. The tank was at 118 PSI when I came in today. So it dropped about 2 PSI in about 15 hours. I think the schraeder valve is leaking because that was the only thing I got to bubble this morning. But I got the backhalf squared up and welded in place. Building the whole backhalf on the table rather than piecing it together on the truck was so much easier. It only took about 10 minutes to square the rails up once I slid them into the stock frame. So it's welded in place, but it still needs some shear load gussets where it ties together, and I want to wrap the bottom of the frame with some 3/16" plate to keep the transition from being drug.
Also made this bracket for my neighbor, to mount a computer monitor to the wall.