tonight I pulled the front bag brackets out. Tomorrow I need to cut the upper bag brackets down. I put 2X4's back in between frame and the lower A arms to prevent damage to the tie rods. I still might notch the frame to make room for the tie rods. I also need to modify the exhaust pipe. That's going to be a challenge with the 5 speed trany.
For the rear I was looking a Ekstensive Metal Works 2 link. The kit comes with everything but bags.
https://www.ekstensive.com/store/pro...728924089666e5