Today's progress.....
- Removed front hangers
- Removed overload stop plates
- Cut 36 rivets (what a PITA)
- Modified front hanger to achieve another 5/8" drop. I drilled a new hole 1.25" higher in the hanger which translates to 5/8" at the axle.
- Mounted one new hanger
- Removed both gas tanks (going to replace with a between the rails burb tank)
Posted via Mobile Device