View Single Post
Old 01-08-2011, 10:07 PM   #33
chopped65
Registered User
 
Join Date: Jul 2010
Location: Alabaster, AL
Posts: 104
Re: 3/4 ton back half build

Got the 4 link welded up. Still waiting on the bag brackets from Porterbuilt to finalize the suspension. Not sure if I should build the panhard bar before I finish the airbags or after. I'm thinking after, that way I know how much room I have because as you can see in the pictures I dont have much.

I never thought how time consuming it would be to complete this project. It's not that I did not know what I was getting into, just thought it would be easier. It is very time consuming in order to get everything measured just right so everything is perfectly square and even. Again the 4 link was built by Porterbuilt and Nate did a great job again.

So, I am still waiting on my notch bridge with the shock bar and upper bag plates built in, my driveshaft hoop, the lower shock bar, lower bag mounts and bump stops from Porterbuilt. Can't wait to see more great work from Nate, then I'll move on to the front end once I'm done in the back.
Attached Images
     
__________________
65 Chevy C-20
Chopped 3", Doors Suicided, completely shaved, 650 hp BBC
chopped65 is offline   Reply With Quote