Quote:
Originally Posted by 69CST-V
Justin....What gauge metal did you use on your floor and also on your transmission hump?
Thanks in advance.
|
Thanks man!, Its all 18 gauge...
Quote:
Originally Posted by 67cheby
you are downright amazing with your metal fab skills !
|
Quote:
Originally Posted by thor
whoa! what a gorgeous floor. amazing work!!!
|
Quote:
Originally Posted by 6772owner
Incredible fab work, I only wish I could get metal to look that good!
|
Thanks Guys!! I really apperciate the kind words!
Quote:
Originally Posted by BlueJeep
Looks great! What tools and what order did you use them in to form that tunnel? Thanks!
|
Thanks, after cutting it out I started with the english wheel to get the curve, next I bent the flange, and put the bead rolls in the larger section, next i cut the upper section and bent it tell it match up, flanged it and rolled it. from the back of the shifter hole all the way around the flage i had to cut out and tapper down to get it to work, which required adding two triangle peices. sound sort of easy but took about 8-10hrs just in the hump.