Quote:
Originally Posted by Rusty Shacleford
While the frame was drying in nice warm Good Friday sun (hard to believe there was 8 inches of snow on the ground just over a week ago) I went back inside the shop to do a little inspection on the cab.
The rockers and a couple floor/inner rocker patches were installed with pop-rivets.
Here's an overall view of the floor. Notice the old license plate used to patch the trans tunnel.
So, I drilled out the rivets on the driver side to get to the floor patches
Then removed the floor patches to find out what I was really dealing with... There's some work to be done, but nothing too bad.
Then I moved to the passenger side... Not as bad, but still some work to do.
|
Photos, part 1 of this post.