Re: 700R4 build thread.
Turn Trans so the Pan rail is facing Up.
Install the TCC Solenoid & Governor Thimble Filters, Push them in with a pocket screwdriver.
Install the Case Checkballs as shown below, If using a Shift Kit...Follow those directions!
The Green Arrows....These are "Z" holes/Alignment holes.
Cut the heads off 2 6x1.00mm bolts, Thread them in the Z holes, They act as dowels, This will align the gaskets, Plate & Valve body.
First pic, '82-Early '87, Install #9 Checkball.
Second Pic, '88-'93, Omit #9 Checkball.
|