Started patching the holes in my high hump cover that I picked up from NLPED here on the board, only got one pic of the fit up but I had several holes to fill and a couple of patches to make.
Cut the floor out and still have to get the fit right. The seam between the floor pan and toeboard was off about 3/16" from the factory. With carpet in place you would never notice, but trying to fit the hump in it was really throwing things out of whack.
So I drilled out the factory spot welds at the seam and repositioned it.
More pics as I work through the fit up.