Re: My '67 Fleetside C10 renew
Oh, and when he did the port work he cut through some of the roofs into water jackets. Said to apply some JB Weld! The spots that got cut through were right below the rocker stud bosses, so the shop drilled and tapped 7/16" down through the stud bores and installed short screws with epoxy and pressure tested them. Bit of a nightmare.
|