Some more progress
Installed the new flywheel.
**
**
Installed the advanced adapters transfer case adapter to link the 4l80e to the np205
**
**
new torque convertor
**
**
mounted the transmission to the motor
**
**
Going to move the cross member back. Came up a little short even with the motor mount sliders
**
**
Lowered the body almost all the way on the frame to check motor clearence
**
**
**
Clearance was good all the way around
**
**
**
While the body is down I am going to figure out the radiator and fan situation.