Got a replacement soldering iron yesterday, so I completed the wires that I could last night. I also worked on routing the harness a bit more.
After the wiring, I mounted the radiator to the core support and mocked it back up to check a few things. I also mounted the power distribution block and the power wire from the battery into the core support. Since the CS has to come back out, I did not mount the terminal block or run the wires thru it yet. Getting closer...
After that, I laid under the truck to study the drive line. I believe that I can make a 3" dia. one piece driveshaft work and clear the trailing arm cross member. I will get a couple more measurements and mock ups this weekend, but plan to get the DS local and have them build it Monday or Tuesday.
After I called in a night in the shop, Korbin came home and surprised me with a load of engine parts. I have almost everything I need to get the engine together this weekend. Plans now are to get the mock up done and finalize my DS layout on Saturday so that I can pull out the engine mock up Saturday night. Korbin and I hope to get the short block together on Sunday. Maybe even the long block if everything falls into place.
7 days left...