Quote:
Originally Posted by Advanced Design
Good update there Richard. And the fence! Wow, well done. Straight, tight, tops of posts uniform height...
|
Thanks Doug.
Quote:
Originally Posted by Advanced Design
...Did you have to drill for some of the posts?
|
Yes indeed. I bought a 9 inch rock auger for the pipe posts that we set in concrete and a 2” “puff auger” for the tee posts; seen in action here:
https://www.youtube.com/watch?v=jA-VzFhsAjo&t=4s The top of the hill was solid rock, every post had to have a hole drilled.
Quote:
Originally Posted by Advanced Design
Did you pile up the rocks along the fence?
|
Yes, I restacked a lot of the old rock fence rather than just have a dozer shove it out of the way.
-Richard