Re: 55 in NH build
Been a busy week. I bought a $20 harbor freight sandblaster to clean up the rear end. Makes a mess but turned out pretty good. I decided to replace the batwing bushings on the IRS. man it was a pita. I had to drill out the rubber so I could punch out the center pin. once that was out I was able to punch out the rubber. I didn't realize there was an out casing so I used a triangle file to cut a slot and bend it in. installing the bushing wasn't gonna happen with C-clamps so I drilled a hole through an oil filter wrench and put some plate stock on the other side. the cup kept the bushing square as I tightened the bolt. rear end is installed!
|