Today was phone call upon phone call.
Messenger message after Messenger message.
Insurance quotes, logistics, research.
Then put to the carport.
Into Mickey’s and my woodpile, digging, measuring and sorting.
Then made up from 100mm, 50mm and a 45mm decking board, left over from last year when we rebuilt the deck, a 4.2 meter long plinth, painted it grey and left it out 5o dry, though the weather is not ideal for drying.
Levelled out, and added some sharp sand, the strip behind the single brick wall.
And finally, added and compacted the blocks, left over from the summertime build. Yes, the rag to blunt the edge is a rag, long since decommissioned.
So next job is to secure the sheets of roofing with another length of decking board, a door post for it to screw into, and then moving the grey plinth into position, so that the cabinets can be fitted onto the raised section, with the roof sheets tightly against the rear of them.
Op at 06.00 in the morning, then off by 07.00 to collect @pauly for a recce and mini road trip.
Maybe it will be interesting.