Re: Another one underway! Meet project Savannah
Beautiful day in Tennessee today, so we pulled the rebuilt original 250 6 cylinder engine and 3 speed transmission out of the truck.
We degreased the firewall and frame rails and brought out the pressure washer to clean away 55 years of South Georgia sand.
Next step is to drop the front and install the huge drilled and slotted front rotors and calipers.
We will have a truck load of parts ready for the media blaster by the end of the week.
The exciting part is dropping in that big ole 6.0 LS. Stay tuned!
POP
__________________
2016 RAM Laramie HEMI
1966 Fairlane GT/A, 390/335 HP
If it costs you a dollar to make a friend, KEEP THE DOLLAR.
If it costs you a friend to make a dollar, KEEP THE FRIEND.
|