getting closer to this frame and suspension drive train portion to completion.... since last post I replaced the PS with new one got all my pulleys lined up new fan on, P coated them along with brackets and flywheel dust cover installed , rebuilt and lined up the Z bar with new linkage made a braided fuel line fuel tank installed and plumbed up to carb Im down to a punch list of about a dozen items