Quote:
Originally Posted by Getter-Done
The more vehicles produce an hour the less parts the technician would have to put on the vehicle.
With these Trucks being run at 30 something units an hour,
The person probably installed several parts on the truck at their job station.
That would be a little under a 2-minute line speed.
|
This is correct -
A guy might have a "main job" like "Fender Set", or "Spare Tire Hang", or "Battery Install" but after they complete that part there are little wires to connect or route; other small things to fill out those extra few seconds.
K