View Single Post
Old 01-12-2024, 01:59 AM   #1
Tpo
Junior Member
 
Join Date: Feb 2019
Location: Eugene, OR
Posts: 91
60-63 gauge between ash tray and heater controls?

Was there ever a clock option that was installed in a square-ish bezel between the ash tray and heat controls?
Thanks
J
Tpo is offline   Reply With Quote