Part 2 of yesterday’s short day.
Changed all the nuts for Nyloc’s
Cut and fitted some high density foam to cover the protruding bolts etc.
Carpeting will be next when I get some more in.
Both sides done, floor down.
Then measure and cut the two parts of the transmission tunnel from the remaining carpet.
Resulting in these weird shapes.
And draped in position.
These will be glued in place once the gearshift is locked in place, @nickwheeler has a plan for that.
Then the gaiter bolted in place and holes for the stick and parking brake cut in the carpet, plus fitting.
Seats back in and bolted down.
Bootfair totally sucked, cold outside today, and possibly rain this afternoon.