Re: Shop improvements and upgrades. Better Space!
We were able to keep the dog out.
With all the rain and cooler temp’s, the concrete was very slow curing out. We ended up closing the doors to the outside, sliding open the big internal door and cranked the heat up in the shop.
That, coupled with two heaters the crew brought in helped. Even so, two workers were here until 1:00AM to power trowel it out properly.
|