View Single Post
Old 11-11-2017, 02:51 PM   #24
47 Fasttoys
Registered User
 
47 Fasttoys's Avatar
 
Join Date: Sep 2013
Location: Westminster, SC
Posts: 933
Re: '47 Loadmaster COE (rebuild pictures)

5-5-2014
Lift day: I thought I would include some info on the lift as I installed it on the first day home and it has been of major help. I bought a Derek Weaver 2 post 9K lift. I installed this in my shop which only has 8' ceilings. This went very well with only 1 minor modification to the roof, I cut out a small section to allow the post to go closer to the wall (4/12 pitch). The beams are heavy but using the engine hoist made it manageable. I then tested the lift with some other toys and made some minor adjustments. Doing it myself it took about 12 hours. The hardest part was drilling the 12, 5 inch deep lag bolt holes with a 1/2" hammer drill. My palms where sore for 2 days. Of course with only 8' ceilings I am limited on how high I can lift stuff, but It should work out well for most of the COE build and I do intend on raising the roof another 6' in the future. The little teardrop is homemade and is used to haul track tires and gear behind the Cobra.

Lost files for pictures on this.
__________________
My '47 C.O.E build
47 Fasttoys is offline   Reply With Quote