Re: Major Disaster In Baltimore
Quote:
Originally Posted by Boog
Press conference just said the original bridge took 5 yrs to build but the replacement should go much faster. Lets hope so.
|
It should, being it's only the elevated erected steel part that needs built, and pilings...probably repairs to existing ends. 50 years in machinery advancements should help
Right now it's a matter of grabbing up the suppliers and get them fabbing. If I was in charge I'd say built it the same using existing prints
__________________
"BUILDING A BETTER WAY TO SERVE THE USA"......67/72......"The New Breed"
GMC '67 C1500 Wideside Super Custom SWB: 327/M22/3.42 posi.........."The '67" (project)
GMC '72 K2500 Wideside Sierra Custom Camper: 350/TH350/4.10 Power-Lok..."The '72" (rolling)
Tim
"Don't call me a redneck. I'm a rough cut country gentleman"
R.I.P. ~ East Side Low Life ~ El Jay ~ 72BLUZ ~ Fasteddie69 ~ Ron586 ~ 67ChevyRedneck ~ Grumpy Old Man ~
|