View Single Post
Old 03-07-2015, 08:41 PM   #156
hgs_notes
GEARHEAD
 
hgs_notes's Avatar
 
Join Date: Aug 2003
Location: MN
Posts: 6,112
Re: 1969 Custom/10 clean up

Quote:
Originally Posted by Steve-W View Post
4 sq meters that'll be about 13 sq foot of Vibraflex for the floor
2 sq meters (6,5 sq foot) StP Gold for the doors, rear wall and fire wall.
I just realized that might be a bit to little..but I'll find out as I'm installing it.
Your math is off. A square meter is about 11 sq ft each, so 4 sq meters would be almost 44 sq ft. You should have plenty.

Good luck with the brakes.
hgs_notes is offline   Reply With Quote