Got home last night and the framing was complete. Only one or two issues with the framing, mostly the lower skirt board that will be used as a form for the concrete. Some are bowed out a good bit, but not bad. They could be moved back in place with some stakes along the outside and pinned to the concrete when it is poured.
Here is a pic of the finished framing:
My two youngest kids thinks its a jungle gym to climb on...
I did start on locating the extra footings for the future install of the lift. I marked out areas with string and will use the string as a reference for the depth. It got late and dark, so no pictures today. I will take a few tonight when I did them out...