Re: New Pole Shed Nebraska
They plan a 48" deep hole with a concrete footer at the bottom, then pack limestone gravel around the pole. The contractor has no issue with the fill since it was mechanically compacted. We also built up enough so they can drive a man lift all around the building,
There is at least 8' all around the footprint.
__________________
________________
1970 GMC Sierra Grande, 2500 133" wb, 402, 4spd.
2007 GMC 3500 SRW 4x4, Crew cab, Duramax/Allison. (Sold}
1987 Chevy Suburban 2500, Silverado, 2wd, 454, t-400
2023 Chevy Silverado LT 3500, crew cab, longbox, 4x4 Z-71 Duramax.
|