Re: 72 Swb starting from the bottom
I finally got the notches made, for the most part. Decided to make them instead of buying and ended up taking longer than anticipated. I figured out that the lowest I could go with stock trailig arms in the stock location would need about 3.5" notch. I did a 4" notch to give some room for a bumpstop. Next up is to figure out the panhard bar frame mount since the stock one had to be removed to box in the frame. And I think I will be going with the tanks inc universal trunk tank and their gpa-8 fuel pump assembly with the walboro 450.
|