Bag plates tacked up.
Front mounts tacked in. I re-drilled the upper holes in order to angle my top bars down. I had them parallel and after some reading about instant center decided to make the change. I won't really know until I can drive 'er down the road
Upper plates fabbed and bags installed. These are 3500# rolling lobe bags from Ride Tech. Those guys are great and very helpful on the phone.
All together and working!! I still need to finish up welding the frame but the 4 link and bags are in.